FA8501-27-RAPID-RPR RPL HVAC B301-OTA Under the RAPID Umbrella Framework: UHHZ990029 RAPID RPR RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), BLDG 300 at Robins AFB, GA Description The Department of the Air Force, 78th Civil Engineer
4 notices · showing 1–4 · 35 ms
- Dept of Defense › Dept of the Air ForceFA8501-27-RAPID-990029_RPR_RPL_HVAC_SYSTEM_BLDG_300latest of 2NAICS 238220Warner Robins, GAMagnitude of construction: $20M–$40M
L7WC02_ B670 Paint Booth and HVAC
Combined Synopsis/SolicitationDept of Defense › Dept of the Air ForceFA857127Q0002latest of 3NAICS 238220Warner Robins, GAEstimated value: $1.5MThis is a new requirement that will be awarded as a brand name competitive full and open contract. The contractor shall provide technical drawings, technical expertise, telephone support, on-site engineering support, liaison services for wa
N045--Boiler 3 Oxygen Analyzer and Steam Flow Meter
Combined Synopsis/SolicitationVeterans Affairs, Department of36C24727Q0050NAICS 238220SDVOSBDublin, GAQuestions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (
N045--SRVS-SUP Team 1 | Boiler 3 Oxygen Analyzer and Steam Flow Meter | CO: Sheryl Harris; Assn. Date: 09/30/26; EAD: 11/15/26
Combined Synopsis/SolicitationVeterans Affairs, Department of36C24727Q0050NAICS 238220SDVOSBDublin, GAThis is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 13. This announcement constitutes this being the only solicitation. Offers are being requested and a separate written s