NITROGEN PIPING REPLACEMENT FOR PLASMA SPRAY BOOTH
Combined Synopsis/SolicitationA complete, leak-free nitrogen piping system connecting the nitrogen generator, storage cylinders, regulator, and plasma spray booth. IAW PWS
A complete, leak-free nitrogen piping system connecting the nitrogen generator, storage cylinders, regulator, and plasma spray booth. IAW PWS
SECTION A – Solicitation Executive Summary 1. The Government will procure the requirements utilizing the three-step procurement outlined below. Step One: A Pre-solicitation Notice will not be submitted separately, as this notice will be enc
Videoscopes are borescopes capable of recording videos and measurements. A flexible scope with a camera can be inserted into unreachable places providing video footage to a display screen. It is used during engine inspections to identify im
Trumpf Pilz Programming Service 76 MXSG Unit request a one-time contract for Reprogramming the Pilz Module. TrumaBend V170X / SN: B0105A0093 The Contractor shall program and configure the integrated Pilz safety controller IAW PWS
The Brady Lightwriter is a complete, self-contained industrial fiber laser workstation. It is used to etch or engrave permanent text or serial numbers etc. on tools, tags, or metal. It will provide high-contrast marks that do not wear off.
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in FAR Subpart 12.6, as a supplemented with additional information included in the notice. This announcement cons
SOLICITATION # FA813226Q0046- FILM PROCESSING EQUIPMENT PM/RM ***PLEASE SEE CSS AND PWS FOR FUTHER DETAILS*** ****AMENDMENT PLEASE SEE UPDATED CSS 10 19 26****
Please review attached Solicitation document for information
No synopsis required
This is a combined synopsis/solicitation notice for the procurement of American Society for Testing and Materials (ASTIM) standard structural steel and metal components for installation of a new overhead crane system. This requirement is 10
Amendment 01: Quote due date extended to 20 October 2026. IMPORTANT NOTE: All amendments must be acknowledged via signature and submitted with the offer. IMPORTANT NOTE: The solicitation number has been updated from FA813926Q0030 to FA81392
The Air Force Sustainment Center (AFSC/PZIMB) at Tinker Air Force Base Oklahoma, intends to award a Sole Source, Firm-Fixed-Price contract for the acquisition of service listed below. This solicitation is a sole source requirement to Fische
The Solicitation will be for projects within the McAlester Army Ammunition Plant (MCAAP). The contractor shall perform all work required as specified within the Statement of Work (SOW) in each individual Task Order (TO). The general descrip
Under the contemplated supply contract, Honeywell International, CAGE: 70210, will provide 18 each Support, Turbine (NSN: 1660-00-286-2643). Appropriation is FMS case funded by LOA IS-D-REG/001. The International Agreement Competitive Restr
This notice serves as DLA Weapon Support’s combined synopsis/solicitation as described in FAR 12.603, in accordance with FAR 5.201, and the approved J&A under authority of FAR 6.103-1 and 10 U.S.C. 3204(a)(1), for addition of KC/RC/WC135 Mi
The 76th MXSG unit is requesting a one-time contract for Geotechnical Engineering Services. Three boring locations will be identified and marked in the field by the MXSG Engineering Office. *** An industry day will be held and open to inter
Only the MAC BOA Holder GCs that attended Site Visit on 12 August 2026 will be able to continue forward toward the award. Updated 16 September 2026 Attached two pictures pertaining to RFIs 15 and 36. Proposal Due Date: 18 September 2026 Onl
No synopsis required
Synopsis not required
Only the MAC BOA Holder GCs that attended Site Visit on 07 August 2026 will be able to continue forward toward the award. Updated 19 August 2026 Attached accessible Section L. Only the MAC BOA Holder GCs that attended Site Visit on 07 Augus
Updated: June 17th, 2026 Solicitation Amended to extend Offer Due date from 2:00pm (CDT) June 17, 2026, to 2:00pm (CDT) June 24, 2026, Design narrative has also been attached to Section J- List of attachments. The Following Clauses have bee
Update 03: June 10, 2026 Photos have been attached in relation to the Environmental study and positive findings Update 02: June 09, 2026 Attached file for Building 5703 Positive findings and Environmental report Update 01: June 09, 2026 As-
No synopsis required
No synopsis required
No synopsis required